Technical & utility · Petit-Lancy
Avenue des Grandes-Communes 9
EGID 1018789 · Latest year: 2025 · Pont-Butin
459
IDC · MJ/m²·yr
474
3-year average
769
Estimated thermal energy · MWh
6'029
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 459
- Peer median
- 387
- Difference
- +18.6 %
- Percentile
- 66th
- Zone median
- —
Higher IDC than 66 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Technical & utility buildings across the canton of Geneva, 2025 (149 buildings).
Zone comparison hidden: fewer than 10 buildings in this zone.
Trend
−4.8 %
Change over 3 years (2022 → 2025: 482 → 459)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredabove
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Technical & utility
- Official use
- Garage
- Main energy carrier
- Gas
- Industrial zone
- Pont-Butin
IDC × SRE, climate-normalised: heating and hot water only, not process energy.