← Back to map

Offices · Meyrin

Rue LECT 29

EGID 1021000 · Latest year: 2025 · ZDAM Meyrin-Satigny

375
IDC · MJ/m²·yr
366
3-year average
409
Estimated thermal energy · MWh
3'930
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
375
Peer median
312
Difference
+20.4 %
Percentile
67th
Zone median
310 (+21.0 %)

Higher IDC than 67 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Offices buildings across the canton of Geneva, 2025 (644 buildings).

Trend

−14.4 %
Change over 3 years (2022 → 2025: 438 → 375)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500600450201120122014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
Heating oil
Industrial zone
ZDAM Meyrin-Satigny

IDC × SRE, climate-normalised: heating and hot water only, not process energy.