← Back to map

Industrial · Meyrin

Rue du Cardinal-JOURNET 25

EGID 1021001 · Latest year: 2017 · ZDAM Meyrin-Satigny

Outdated data: the last IDC declaration for this building dates from 2017. It is shown for reference but excluded from statistics.

831
IDC · MJ/m²·yr
800
3-year average
233
Estimated thermal energy · MWh
1'011
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
831
Peer median
429
Difference
+93.7 %
Percentile
95th
Zone median
404 (+105.9 %)

In 2017, higher IDC than 95 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Industrial buildings across the canton of Geneva, 2017 (426 buildings).

Trend

+18.4 %
Change over 3 years (2014 → 2017: 702 → 831)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)above

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

020040060080045020102012201420162017
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Atelier
Main energy carrier
Heating oil
Industrial zone
ZDAM Meyrin-Satigny

IDC × SRE, climate-normalised: heating and hot water only, not process energy.