Industrial · Meyrin
Chemin du Grand-Puits 38
EGID 1021662 · Latest year: 2025 · ZDAM Meyrin-Satigny
313
IDC · MJ/m²·yr
321
3-year average
455
Estimated thermal energy · MWh
5'232
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 313
- Peer median
- 318
- Difference
- −1.6 %
- Percentile
- 48th
- Zone median
- 310 (+1.0 %)
Higher IDC than 48 % of similar buildings. Close to the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).
Trend
−22.5 %
Change over 3 years (2022 → 2025: 404 → 313)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Usine
- Main energy carrier
- Heating oil
- Industrial zone
- ZDAM Meyrin-Satigny
IDC × SRE, climate-normalised: heating and hot water only, not process energy.