Offices · Vernier
Chemin de la Croisette 5
EGID 1028225 · Latest year: 2025 · ZIBAT
340
IDC · MJ/m²·yr
337
3-year average
110
Estimated thermal energy · MWh
1'167
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 340
- Peer median
- 312
- Difference
- +9.1 %
- Percentile
- 58th
- Zone median
- 269 (+26.4 %)
Higher IDC than 58 % of similar buildings. Close to the peer median.
Peer group: Offices buildings across the canton of Geneva, 2025 (644 buildings).
Trend
−33.7 %
Change over 3 years (2022 → 2025: 513 → 340)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Offices
- Official use
- Bureaux
- Main energy carrier
- Heating oil
- Industrial zone
- ZIBAT
IDC × SRE, climate-normalised: heating and hot water only, not process energy.