← Back to map

Offices · Vernier

Chemin de la Croisette 5

EGID 1028225 · Latest year: 2025 · ZIBAT

340
IDC · MJ/m²·yr
337
3-year average
110
Estimated thermal energy · MWh
1'167
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
340
Peer median
312
Difference
+9.1 %
Percentile
58th
Zone median
269 (+26.4 %)

Higher IDC than 58 % of similar buildings. Close to the peer median.

Peer group: Offices buildings across the canton of Geneva, 2025 (644 buildings).

Trend

−33.7 %
Change over 3 years (2022 → 2025: 513 → 340)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0200400600450201120122014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
Heating oil
Industrial zone
ZIBAT

IDC × SRE, climate-normalised: heating and hot water only, not process energy.