Offices · Le Lignon
Chemin des Carpières 8
EGID 1028770 · Latest year: 2021 · ZILI
531
IDC · MJ/m²·yr
—
3-year average
23
Estimated thermal energy · MWh
154
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 531
- Peer median
- 364
- Difference
- +45.9 %
- Percentile
- 85th
- Zone median
- 374 (+42.0 %)
Higher IDC than 85 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Offices buildings across the canton of Geneva, 2021 (833 buildings).
Trend
−3.6 %
Change over 3 years (2018 → 2021: 551 → 531)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures required3-year average not available
- 800 — significant (until 2026)3-year average not available
- 650 — significant (from 2027)3-year average not available
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Offices
- Official use
- Bureaux
- Main energy carrier
- Gas
- Industrial zone
- ZILI
IDC × SRE, climate-normalised: heating and hot water only, not process energy.