← Back to map

Offices · Les Acacias

Rue François-DUSSAUD 17

EGID 2037034 · Latest year: 2025 · PAV · Les Acacias

488
IDC · MJ/m²·yr
472
3-year average
410
Estimated final energy · MWh
3'024
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
488
Peer median
312
Difference
+56.7 %
Percentile
87th
Zone median
413 (+18.2 %)

Higher IDC than 87 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Offices buildings across the canton of Geneva, 2025 (644 buildings).

Trend

+3.0 %
Change over 3 years (2022 → 2025: 474 → 488)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500600450201020122014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
Heating oil
Industrial zone
PAV · Les Acacias

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Rue François-DUSSAUD 17 — IDC heat benchmark · ThermoGeneva