Industrial · Les Acacias
Rue BOISSONNAS 18
EGID 2037793 · Latest year: 2024 · PAV · Les Acacias
495
IDC · MJ/m²·yr
552
3-year average
241
Estimated thermal energy · MWh
1'753
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 495
- Peer median
- 338
- Difference
- +46.7 %
- Percentile
- 84th
- Zone median
- 444 (+11.6 %)
Higher IDC than 84 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Industrial buildings across the canton of Geneva, 2024 (376 buildings).
Trend
+2.5 %
Change over 3 years (2021 → 2024: 483 → 495)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredabove
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Atelier
- Main energy carrier
- Heating oil
- Industrial zone
- PAV · Les Acacias
IDC × SRE, climate-normalised: heating and hot water only, not process energy.