← Back to map

Logistics & storage · Grand-Lancy

Route de La-Chapelle 1

EGID 2040608 · Latest year: 2025 · Bachet-de-Pesay

310
IDC · MJ/m²·yr
307
3-year average
3'153
Estimated thermal energy · MWh
36'614
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
310
Peer median
398
Difference
−22.0 %
Percentile
29th
Zone median
—

Higher IDC than 29 % of similar buildings. Lower than the peer median.

Peer group: Logistics & storage buildings across the canton of Geneva, 2025 (104 buildings).

Zone comparison hidden: fewer than 10 buildings in this zone.

Trend

+0.3 %
Change over 3 years (2022 → 2025: 309 → 310)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

01002003004005004502014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Logistics & storage
Official use
Dépôt TPG
Main energy carrier
District heating
Industrial zone
Bachet-de-Pesay

IDC × SRE, climate-normalised: heating and hot water only, not process energy.