Rampe du Pont-Rouge 6
EGID 2040799 · Latest year: 2025 · Petit-Lancy · ZIA #5
Compared with similar buildings
- IDC
- 294
- Peer median
- 312
- Difference
- −5.6 %
- Percentile
- 45th
- Zone median
- —
Higher IDC than 45 % of similar buildings. Close to the peer median.
Peer group: Offices buildings across the canton of Geneva, 2025 (644 buildings).
Zone comparison hidden: fewer than 10 buildings in this zone.
Trend
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Offices
- Official use
- Bureaux
- Main energy carrier
- Heat pump (heat metering)
- Industrial zone
- Petit-Lancy · ZIA #5
IDC × SRE, climate-normalised: heating and hot water only, not process energy.
For heat pumps the IDC counts electricity used, which lowers the value compared with fuel-based systems.