← Back to map

Offices · Petit-Lancy

Avenue des Grandes-Communes 8

EGID 2040963 · Latest year: 2026 · Pont-Butin

201
IDC · MJ/m²·yr
202
3-year average
206
Estimated final energy · MWh
3'690
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
201
Peer median
315
Difference
−36.2 %
Percentile
15th
Zone median
—

Higher IDC than 15 % of similar buildings. Lower than the peer median.

Peer group: Offices buildings across the canton of Geneva, 2026 (121 buildings).

Zone comparison hidden: fewer than 10 buildings in this zone.

Trend

−5.2 %
Change over 3 years (2023 → 2026: 212 → 201)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

010020030040050045020112012201620182020202220242026
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
District heating
Industrial zone
Pont-Butin

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Avenue des Grandes-Communes 8 — IDC heat benchmark · ThermoGeneva