← Back to map

Offices · Meyrin

Rue du Bois-du-Lan 8

EGID 2041222 · Latest year: 2024 · ZDAM Meyrin-Satigny

570
IDC · MJ/m²·yr
598
3-year average
296
Estimated thermal energy · MWh
1'867
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
570
Peer median
322
Difference
+77.0 %
Percentile
92nd
Zone median
379 (+50.4 %)

Higher IDC than 92 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Offices buildings across the canton of Geneva, 2024 (740 buildings).

Trend

−9.7 %
Change over 3 years (2021 → 2024: 631 → 570)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

02004006004502012201420162018202020222024
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
Gas
Industrial zone
ZDAM Meyrin-Satigny

IDC × SRE, climate-normalised: heating and hot water only, not process energy.