← Back to map

Industrial · Meyrin

Rue du Cardinal-JOURNET 13

EGID 2041431 · Latest year: 2015 · ZDAM Meyrin-Satigny

Outdated data: the last IDC declaration for this building dates from 2015. It is shown for reference but excluded from statistics.

258
IDC · MJ/m²·yr
277
3-year average
43
Estimated thermal energy · MWh
596
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
258
Peer median
424
Difference
−39.2 %
Percentile
12th
Zone median
399 (−35.3 %)

In 2015, higher IDC than 12 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2015 (453 buildings).

Trend

+3.2 %
Change over 3 years (2012 → 2015: 250 → 258)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

01002003004005004502011201220142015
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Atelier
Main energy carrier
Heating oil
Industrial zone
ZDAM Meyrin-Satigny

IDC × SRE, climate-normalised: heating and hot water only, not process energy.