Offices · Plan-les-Ouates
Chemin des Aulx 8
EGID 2041746 · Latest year: 2022 · ZIPLO
87
IDC · MJ/m²·yr
154
3-year average
195
Estimated thermal energy · MWh
8'073
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 87
- Peer median
- 350
- Difference
- −75.1 %
- Percentile
- 1st
- Zone median
- 279 (−68.8 %)
Higher IDC than 1 % of similar buildings. Lower than the peer median.
Peer group: Offices buildings across the canton of Geneva, 2022 (828 buildings).
Trend
−51.9 %
Change over 3 years (2019 → 2022: 181 → 87)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Offices
- Official use
- Bureaux
- Main energy carrier
- District heating (allocated)
- Industrial zone
- ZIPLO
IDC × SRE, climate-normalised: heating and hot water only, not process energy.