← Back to map

Industrial · Plan-les-Ouates

Chemin du Champ-des-Filles 19

EGID 2041863 · Latest year: 2026 · ZIPLO

291
IDC · MJ/m²·yr
253
3-year average
825
Estimated final energy · MWh
10'209
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
291
Peer median
311
Difference
−6.4 %
Percentile
44th
Zone median
160 (+82.4 %)

Higher IDC than 44 % of similar buildings. Close to the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2026 (65 buildings).

Trend

−10.2 %
Change over 3 years (2023 → 2026: 324 → 291)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500450201120122014201620182020202220242026
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Usine
Main energy carrier
Gas
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.