Industrial · Plan-les-Ouates
Chemin du Pont-du-Centenaire 141
EGID 2041986 · Latest year: 2026 · ZIPLO
296
IDC · MJ/m²·yr
300
3-year average
1'871
Estimated final energy · MWh
22'754
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 296
- Peer median
- 311
- Difference
- −4.8 %
- Percentile
- 47th
- Zone median
- 160 (+85.6 %)
Higher IDC than 47 % of similar buildings. Close to the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2026 (65 buildings).
Trend
+10.4 %
Change over 3 years (2023 → 2026: 268 → 296)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Usine
- Main energy carrier
- District heating
- Industrial zone
- ZIPLO
IDC × SRE, climate-normalised: heating and hot water only, not process energy.