← Back to map

Logistics & storage · Satigny

Rue du Pré-Salomon 25

EGID 2042374 · Latest year: 2024 · ZIBAY

483
IDC · MJ/m²·yr
454
3-year average
125
Estimated thermal energy · MWh
928
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
483
Peer median
430
Difference
+12.3 %
Percentile
62nd
Zone median
357 (+35.5 %)

Higher IDC than 62 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Logistics & storage buildings across the canton of Geneva, 2024 (114 buildings).

Trend

+12.6 %
Change over 3 years (2021 → 2024: 429 → 483)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

010020030040050060045020112012201420162018202020222024
━ Building IDC╌ Peer median
Building type
Logistics & storage
Official use
Hangar
Main energy carrier
Wood chips (hardwood)
Industrial zone
ZIBAY

IDC × SRE, climate-normalised: heating and hot water only, not process energy.