Avenue Louis-PICTET 9
EGID 2043429 · Latest year: 2022 · Via Monnet
Compared with similar buildings
- IDC
- 465
- Peer median
- 371
- Difference
- +25.3 %
- Percentile
- 73rd
- Zone median
- —
Higher IDC than 73 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Industrial buildings across the canton of Geneva, 2022 (407 buildings).
Zone comparison hidden: fewer than 10 buildings in this zone.
Trend
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Usine
- Main energy carrier
- Heat pump electricity (after 5 Aug 2010)
- Industrial zone
- Via Monnet
IDC × SRE, climate-normalised: heating and hot water only, not process energy.
For heat pumps the IDC counts electricity used, which lowers the value compared with fuel-based systems.