Industrial · Plan-les-Ouates
Chemin du Champ-des-Filles 5
EGID 2749639 · Latest year: 2025 · ZIPLO
286
IDC · MJ/m²·yr
285
3-year average
86
Estimated thermal energy · MWh
1'076
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 286
- Peer median
- 318
- Difference
- −10.1 %
- Percentile
- 40th
- Zone median
- 235 (+21.7 %)
Higher IDC than 40 % of similar buildings. Lower than the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).
Trend
+1.4 %
Change over 3 years (2022 → 2025: 282 → 286)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Atelier
- Main energy carrier
- Gas
- Industrial zone
- ZIPLO
IDC × SRE, climate-normalised: heating and hot water only, not process energy.