← Back to map

Industrial · Plan-les-Ouates

Chemin du Pré-Fleuri 20

EGID 295020127 · Latest year: 2014 · ZIPLO

Outdated data: the last IDC declaration for this building dates from 2014. It is shown for reference but excluded from statistics.

1'267
IDC · MJ/m²·yr
1'101
3-year average
413
Estimated thermal energy · MWh
1'173
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
1'267
Peer median
436
Difference
+190.9 %
Percentile
98th
Zone median
366 (+246.2 %)

In 2014, higher IDC than 98 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Industrial buildings across the canton of Geneva, 2014 (516 buildings).

Trend

+36.7 %
Change over 3 years (2011 → 2014: 927 → 1'267)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)above
  • 650 — significant (from 2027)above

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

020040060080010001200450201120122014
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Atelier
Main energy carrier
Gas
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.