Industrial · Plan-les-Ouates
Chemin du Champ-des-Filles 39
EGID 295020471 · Latest year: 2022 · ZIPLO
555
IDC · MJ/m²·yr
527
3-year average
2'142
Estimated thermal energy · MWh
13'893
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 555
- Peer median
- 371
- Difference
- +49.6 %
- Percentile
- 85th
- Zone median
- 279 (+98.9 %)
Higher IDC than 85 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Industrial buildings across the canton of Geneva, 2022 (407 buildings).
Trend
−9.9 %
Change over 3 years (2019 → 2022: 616 → 555)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredabove
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Autre bât. d'activités
- Main energy carrier
- Gas
- Industrial zone
- ZIPLO
IDC × SRE, climate-normalised: heating and hot water only, not process energy.