Industrial · Plan-les-Ouates
Chemin du Pré-Fleuri 31
EGID 295030258 · Latest year: 2023 · ZIPLO
299
IDC · MJ/m²·yr
317
3-year average
70
Estimated thermal energy · MWh
845
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 299
- Peer median
- 338
- Difference
- −11.5 %
- Percentile
- 37th
- Zone median
- 270 (+10.7 %)
Higher IDC than 37 % of similar buildings. Lower than the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2023 (394 buildings).
Trend
+6.4 %
Change over 3 years (2020 → 2023: 281 → 299)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Autre bât. d'activités
- Main energy carrier
- Gas
- Industrial zone
- ZIPLO
IDC × SRE, climate-normalised: heating and hot water only, not process energy.