← Back to map

Industrial · Plan-les-Ouates

Chemin du Pré-Fleuri 31

EGID 295030258 · Latest year: 2023 · ZIPLO

299
IDC · MJ/m²·yr
317
3-year average
70
Estimated thermal energy · MWh
845
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
299
Peer median
338
Difference
−11.5 %
Percentile
37th
Zone median
270 (+10.7 %)

Higher IDC than 37 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2023 (394 buildings).

Trend

+6.4 %
Change over 3 years (2020 → 2023: 281 → 299)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

01002003004005004502013201420162018202020222023
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Autre bât. d'activités
Main energy carrier
Gas
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.