← Back to map

Industrial · Carouge GE

Route de Saint-Julien 11

EGID 295060193 · Latest year: 2025 · Route de Saint-Julien

407
IDC · MJ/m²·yr
433
3-year average
520
Estimated thermal energy · MWh
4'596
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
407
Peer median
318
Difference
+28.0 %
Percentile
72nd
Zone median
—

Higher IDC than 72 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).

Zone comparison hidden: fewer than 10 buildings in this zone.

Trend

+2.8 %
Change over 3 years (2022 → 2025: 396 → 407)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0200400600800450201120122014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Usine
Main energy carrier
Gas
Industrial zone
Route de Saint-Julien

IDC × SRE, climate-normalised: heating and hot water only, not process energy.