← Back to map

Industrial · Plan-les-Ouates

Route de la Galaise 18

EGID 295060277 · Latest year: 2025 · ZIPLO

231
IDC · MJ/m²·yr
237
3-year average
482
Estimated thermal energy · MWh
7'515
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
231
Peer median
318
Difference
−27.4 %
Percentile
27th
Zone median
235 (−1.7 %)

Higher IDC than 27 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).

Trend

+18.5 %
Change over 3 years (2022 → 2025: 195 → 231)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500450201120122014202220242025
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Usine
Main energy carrier
Gas
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.