Offices · Grand-Lancy
Avenue Eugène-LANCE 38TER
EGID 295073688 · Latest year: 2024 · Rambossons
348
IDC · MJ/m²·yr
356
3-year average
175
Estimated thermal energy · MWh
1'812
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 348
- Peer median
- 322
- Difference
- +8.1 %
- Percentile
- 57th
- Zone median
- —
Higher IDC than 57 % of similar buildings. Close to the peer median.
Peer group: Offices buildings across the canton of Geneva, 2024 (740 buildings).
Zone comparison hidden: fewer than 10 buildings in this zone.
Trend
−9.1 %
Change over 3 years (2021 → 2024: 383 → 348)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Offices
- Official use
- Bureaux
- Main energy carrier
- Gas
- Industrial zone
- Rambossons
IDC × SRE, climate-normalised: heating and hot water only, not process energy.