← Back to map

Offices · Petit-Lancy

Avenue des Grandes-Communes 6

EGID 295075203 · Latest year: 2021 · Pont-Butin

422
IDC · MJ/m²·yr
384
3-year average
280
Estimated thermal energy · MWh
2'388
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
422
Peer median
364
Difference
+15.9 %
Percentile
64th
Zone median
368 (+14.8 %)

Higher IDC than 64 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Offices buildings across the canton of Geneva, 2021 (833 buildings).

Trend

+13.4 %
Change over 3 years (2018 → 2021: 372 → 422)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500450201120122014201820202021
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
District heating (metered tariff)
Industrial zone
Pont-Butin

IDC × SRE, climate-normalised: heating and hot water only, not process energy.