Industrial · Vernier
Chemin de Champs-Prévost 22
EGID 295077779 · Latest year: 2025 · ZIBAT
156
IDC · MJ/m²·yr
146
3-year average
27
Estimated thermal energy · MWh
625
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 156
- Peer median
- 318
- Difference
- −50.9 %
- Percentile
- 15th
- Zone median
- 269 (−42.0 %)
Higher IDC than 15 % of similar buildings. Lower than the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).
Trend
−3.1 %
Change over 3 years (2022 → 2025: 161 → 156)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Atelier
- Main energy carrier
- Heating oil (heat sub-metering)
- Industrial zone
- ZIBAT
IDC × SRE, climate-normalised: heating and hot water only, not process energy.