Logistics & storage · Satigny
Rue du Pré-Salomon 18
EGID 295077925 · Latest year: 2025 · ZIBAY
751
IDC · MJ/m²·yr
769
3-year average
55
Estimated thermal energy · MWh
263
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 751
- Peer median
- 398
- Difference
- +88.9 %
- Percentile
- 91st
- Zone median
- 171 (+340.5 %)
Higher IDC than 91 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Logistics & storage buildings across the canton of Geneva, 2025 (104 buildings).
Trend
−9.6 %
Change over 3 years (2022 → 2025: 831 → 751)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredabove
- 800 — significant (until 2026)below
- 650 — significant (from 2027)above
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Logistics & storage
- Official use
- Dépôt
- Main energy carrier
- Gas
- Industrial zone
- ZIBAY
IDC × SRE, climate-normalised: heating and hot water only, not process energy.