← Back to map

Industrial · Plan-les-Ouates

Chemin des Aulx 3

EGID 295090069 · Latest year: 2013 · ZIPLO

Outdated data: the last IDC declaration for this building dates from 2013. It is shown for reference but excluded from statistics.

100
IDC · MJ/m²·yr
102
3-year average
3
Estimated thermal energy · MWh
104
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
100
Peer median
436
Difference
−77.1 %
Percentile
1st
Zone median
376 (−73.4 %)

In 2013, higher IDC than 1 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2013 (518 buildings).

Trend

Not enough history for a 3-year comparison.

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500450201120122013
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Usine
Main energy carrier
Heating oil
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin des Aulx 3 — IDC heat benchmark · ThermoGeneva