Technical & utility · Le Lignon
Route du Bois-des-Frères 72
EGID 295091629 · Latest year: 2026 · ZILI
366
IDC · MJ/m²·yr
364
3-year average
215
Estimated thermal energy · MWh
2'116
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 366
- Peer median
- 383
- Difference
- −4.4 %
- Percentile
- 46th
- Zone median
- —
Higher IDC than 46 % of similar buildings. Close to the peer median.
Peer group: Technical & utility buildings across the canton of Geneva, 2026 (49 buildings).
Zone comparison hidden: fewer than 10 buildings in this zone.
Trend
−4.7 %
Change over 3 years (2023 → 2026: 384 → 366)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Technical & utility
- Official use
- Garage
- Main energy carrier
- District heating
- Industrial zone
- ZILI
IDC × SRE, climate-normalised: heating and hot water only, not process energy.