← Back to map

Other · Grand-Lancy

Chemin Le-Sapay 1

EGID 295097426 · Latest year: 2025 · La Chapelle

329
IDC · MJ/m²·yr
336
3-year average
126
Estimated thermal energy · MWh
1'377
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
329
Peer median
413
Difference
−20.3 %
Percentile
29th
Zone median
544 (−39.5 %)

Higher IDC than 29 % of similar buildings. Lower than the peer median.

Peer group: Other buildings across the canton of Geneva, 2025 (161 buildings).

Trend

+3.5 %
Change over 3 years (2022 → 2025: 318 → 329)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

010020030040050060045020112012201620182020202220242025
━ Building IDC╌ Peer median
Building type
Other
Official use
Autre bât. 20m2 et plus
Main energy carrier
Heating oil
Industrial zone
La Chapelle

IDC × SRE, climate-normalised: heating and hot water only, not process energy.