← Back to map

Technical & utility · Grand-Lancy

Chemin Le-Sapay 1

EGID 295097758 · Latest year: 2025 · La Chapelle

596
IDC · MJ/m²·yr
576
3-year average
856
Estimated thermal energy · MWh
5'168
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
596
Peer median
387
Difference
+54.0 %
Percentile
82nd
Zone median
544 (+9.6 %)

Higher IDC than 82 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Technical & utility buildings across the canton of Geneva, 2025 (149 buildings).

Trend

+20.2 %
Change over 3 years (2022 → 2025: 496 → 596)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

020040060080045020112012201620182020202220242025
━ Building IDC╌ Peer median
Building type
Technical & utility
Official use
Voirie-entretien
Main energy carrier
District heating
Industrial zone
La Chapelle

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin Le-Sapay 1 — IDC heat benchmark · ThermoGeneva