← Back to map

Industrial · Le Lignon

Chemin des Carpières 6BIS

EGID 295097933 · Latest year: 2018 · ZILI

Outdated data: the last IDC declaration for this building dates from 2018. It is shown for reference but excluded from statistics.

331
IDC · MJ/m²·yr
310
3-year average
24
Estimated thermal energy · MWh
260
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
331
Peer median
430
Difference
−22.9 %
Percentile
23rd
Zone median
414 (−20.0 %)

In 2018, higher IDC than 23 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2018 (412 buildings).

Trend

+6.8 %
Change over 3 years (2015 → 2018: 310 → 331)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

010020030040050060045020112012201420162018
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Atelier
Main energy carrier
Gas
Industrial zone
ZILI

IDC × SRE, climate-normalised: heating and hot water only, not process energy.