← Back to map

Industrial · Plan-les-Ouates

Chemin du Pré-Fleuri 3

EGID 295112265 · Latest year: 2024 · ZIPLO

74
IDC · MJ/m²·yr
92
3-year average
319
Estimated thermal energy · MWh
15'494
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
74
Peer median
338
Difference
−78.1 %
Percentile
2nd
Zone median
252 (−70.6 %)

Higher IDC than 2 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2024 (376 buildings).

Trend

−21.3 %
Change over 3 years (2021 → 2024: 94 → 74)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

010020030040050045020112012201420162018202020222024
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Autre bât. d'activités
Main energy carrier
Gas
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.