← Back to map

Industrial · Plan-les-Ouates

Chemin du Tourbillon 8

EGID 295112490 · Latest year: 2021 · ZIPLO

429
IDC · MJ/m²·yr
454
3-year average
532
Estimated thermal energy · MWh
4'461
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
429
Peer median
386
Difference
+11.3 %
Percentile
63rd
Zone median
325 (+32.0 %)

Higher IDC than 63 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Industrial buildings across the canton of Geneva, 2021 (396 buildings).

Trend

+2.9 %
Change over 3 years (2018 → 2021: 417 → 429)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

01002003004005004502011201220142016201820202021
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Atelier
Main energy carrier
Gas
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin du Tourbillon 8 — IDC heat benchmark · ThermoGeneva