← Back to map

Industrial · Petit-Lancy

Chemin Louis-HUBERT 3

EGID 295117979 · Latest year: 2023 · Pont-Butin

276
IDC · MJ/m²·yr
281
3-year average
575
Estimated thermal energy · MWh
7'499
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
276
Peer median
338
Difference
−18.3 %
Percentile
31st
Zone median
—

Higher IDC than 31 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2023 (394 buildings).

Zone comparison hidden: fewer than 10 buildings in this zone.

Trend

+4.9 %
Change over 3 years (2020 → 2023: 263 → 276)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

010020030040050045020112012201420162018202020222023
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Autre bât. d'activités
Main energy carrier
District heating (metered tariff)
Industrial zone
Pont-Butin

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin Louis-HUBERT 3 — IDC heat benchmark · ThermoGeneva