← Back to map

Industrial · Les Acacias

Rue François-DUSSAUD 7

EGID 295118252 · Latest year: 2025 · PAV · Les Acacias

414
IDC · MJ/m²·yr
435
3-year average
1'365
Estimated thermal energy · MWh
11'865
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
414
Peer median
318
Difference
+30.2 %
Percentile
75th
Zone median
413 (+0.2 %)

Higher IDC than 75 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).

Trend

−13.8 %
Change over 3 years (2022 → 2025: 480 → 414)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500600450201120122014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Usine
Main energy carrier
Gas
Industrial zone
PAV · Les Acacias

IDC × SRE, climate-normalised: heating and hot water only, not process energy.