← Back to map

Industrial · Plan-les-Ouates

Rue du Champ-Blanchod 13

EGID 295130386 · Latest year: 2024 · ZIPLO

324
IDC · MJ/m²·yr
329
3-year average
140
Estimated thermal energy · MWh
1'554
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
324
Peer median
338
Difference
−4.0 %
Percentile
47th
Zone median
252 (+28.6 %)

Higher IDC than 47 % of similar buildings. Close to the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2024 (376 buildings).

Trend

−17.1 %
Change over 3 years (2021 → 2024: 391 → 324)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

02004006004502012201420162018202020222024
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Autre bât. d'activités
Main energy carrier
Gas
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.