Offices · Satigny
Rue De-TURRETTIN 5
EGID 295160413 · Latest year: 2025 · ZIMEYSA reliée au rail
334
IDC · MJ/m²·yr
—
3-year average
23
Estimated thermal energy · MWh
247
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 334
- Peer median
- 312
- Difference
- +7.2 %
- Percentile
- 57th
- Zone median
- —
Higher IDC than 57 % of similar buildings. Close to the peer median.
Peer group: Offices buildings across the canton of Geneva, 2025 (644 buildings).
Zone comparison hidden: fewer than 10 buildings in this zone.
Trend
Not enough history for a 3-year comparison.
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures required3-year average not available
- 800 — significant (until 2026)3-year average not available
- 650 — significant (from 2027)3-year average not available
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Offices
- Official use
- Bureaux
- Main energy carrier
- Heating oil
- Industrial zone
- ZIMEYSA reliée au rail
IDC × SRE, climate-normalised: heating and hot water only, not process energy.