Industrial · Plan-les-Ouates
Chemin du Pré-Fleuri 15
EGID 295165454 · Latest year: 2025 · ZIPLO
138
IDC · MJ/m²·yr
115
3-year average
1'278
Estimated thermal energy · MWh
33'350
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 138
- Peer median
- 318
- Difference
- −56.6 %
- Percentile
- 12th
- Zone median
- 235 (−41.3 %)
Higher IDC than 12 % of similar buildings. Lower than the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).
Trend
+55.1 %
Change over 3 years (2022 → 2025: 89 → 138)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Autre bât. d'activités
- Main energy carrier
- District heating
- Industrial zone
- ZIPLO
IDC × SRE, climate-normalised: heating and hot water only, not process energy.