Industrial · Plan-les-Ouates

Chemin du Pré-Fleuri 5

EGID 295171793 · Latest year: 2025 · ZIPLO

108
IDC · MJ/m²·yr
122
3-year average
786
Estimated thermal energy · MWh
26'188
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
108
Peer median
318
Difference
−66.0 %
Percentile
8th
Zone median
235 (−54.0 %)

Higher IDC than 8 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).

Trend

+42.1 %
Change over 3 years (2022 → 2025: 76 → 108)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500450201620182020202220242025
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Autre bât. d'activités
Main energy carrier
District heating
Industrial zone
ZIPLO

IDC × SRE, climate-normalised: heating and hot water only, not process energy.