← Back to map

Industrial · Thônex

Chemin de la Mousse 80

EGID 295517942 · Latest year: 2025 · Chemin de la Mousse · Thônex

51
IDC · MJ/m²·yr
53
3-year average
105
Estimated thermal energy · MWh
7'428
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
51
Peer median
318
Difference
−84.0 %
Percentile
1st
Zone median
—

Higher IDC than 1 % of similar buildings. Lower than the peer median.

Peer group: Industrial buildings across the canton of Geneva, 2025 (333 buildings).

Zone comparison hidden: fewer than 10 buildings in this zone.

Trend

−12.1 %
Change over 3 years (2022 → 2025: 58 → 51)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

01002003004005004502021202220242025
━ Building IDC╌ Peer median
Building type
Industrial
Official use
Autre bât. d'activités
Main energy carrier
Heat pump (electricity consumed)
Industrial zone
Chemin de la Mousse · Thônex

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

For heat pumps the IDC counts electricity used, which lowers the value compared with fuel-based systems.