Logistics & storage · Vernier
Chemin de Champs-Prévost 30
EGID 295521890 · Latest year: 2025 · ZIBAT
185
IDC · MJ/m²·yr
211
3-year average
1'057
Estimated thermal energy · MWh
20'576
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 185
- Peer median
- 398
- Difference
- −53.5 %
- Percentile
- 13th
- Zone median
- 269 (−31.2 %)
Higher IDC than 13 % of similar buildings. Lower than the peer median.
Peer group: Logistics & storage buildings across the canton of Geneva, 2025 (104 buildings).
Trend
−15.9 %
Change over 3 years (2022 → 2025: 220 → 185)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Logistics & storage
- Official use
- Dépôt TPG
- Main energy carrier
- District heating
- Industrial zone
- ZIBAT
IDC × SRE, climate-normalised: heating and hot water only, not process energy.