← Back to map

Offices · Vernier

Chemin de Delay 18

EGID 1029755 · Latest year: 2017 · ZIMOGA

Outdated data: the last IDC declaration for this building dates from 2017. It is shown for reference but excluded from statistics.

588
IDC · MJ/m²·yr
557
3-year average
93
Estimated final energy · MWh
569
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
588
Peer median
393
Difference
+49.6 %
Percentile
87th
Zone median
363 (+62.0 %)

In 2017, higher IDC than 87 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Offices buildings across the canton of Geneva, 2017 (867 buildings).

Trend

+4.6 %
Change over 3 years (2014 → 2017: 562 → 588)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredabove
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0200400600800100045020112012201420162017
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
Heating oil
Industrial zone
ZIMOGA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin de Delay 18 — IDC heat benchmark · ThermoGeneva