← Back to map

Logistics & storage · Meyrin

Chemin des Léchères 3

EGID 2041138 · Latest year: 2017 · ZIMEYSA

Outdated data: the last IDC declaration for this building dates from 2017. It is shown for reference but excluded from statistics.

282
IDC · MJ/m²·yr
294
3-year average
123
Estimated thermal energy · MWh
1'571
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
282
Peer median
460
Difference
−38.7 %
Percentile
11th
Zone median
392 (−28.1 %)

In 2017, higher IDC than 11 % of similar buildings. Lower than the peer median.

Peer group: Logistics & storage buildings across the canton of Geneva, 2017 (140 buildings).

Trend

−28.8 %
Change over 3 years (2014 → 2017: 396 → 282)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

01002003004005004502013201420162017
━ Building IDC╌ Peer median
Building type
Logistics & storage
Official use
Dépôt
Main energy carrier
Heating oil
Industrial zone
ZIMEYSA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin des Léchères 3 — IDC heat benchmark · ThermoGeneva