← Back to map

Offices · Satigny

Rue du Pré-de-la-Fontaine 8

EGID 2042535 · Latest year: 2021 · ZIMEYSA

441
IDC · MJ/m²·yr
401
3-year average
802
Estimated thermal energy · MWh
6'548
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
441
Peer median
364
Difference
+21.2 %
Percentile
69th
Zone median
354 (+24.6 %)

Higher IDC than 69 % of similar buildings. Higher than the peer median — may warrant further assessment.

Peer group: Offices buildings across the canton of Geneva, 2021 (833 buildings).

Trend

+22.8 %
Change over 3 years (2018 → 2021: 359 → 441)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

01002003004005004502011201220142016201820202021
━ Building IDC╌ Peer median
Building type
Offices
Official use
Bureaux
Main energy carrier
Heat pump electricity (after 5 Aug 2010)
Industrial zone
ZIMEYSA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

For heat pumps the IDC counts electricity used, which lowers the value compared with fuel-based systems.