Logistics & storage · Vernier
Chemin Grenet 18
EGID 2376651 · Latest year: 2024 · ZIMOGA
486
IDC · MJ/m²·yr
514
3-year average
100
Estimated thermal energy · MWh
744
Heated floor area (SRE) · m²
Compared with similar buildings
050100
- IDC
- 486
- Peer median
- 430
- Difference
- +13.0 %
- Percentile
- 64th
- Zone median
- 284 (+71.1 %)
Higher IDC than 64 % of similar buildings. Higher than the peer median — may warrant further assessment.
Peer group: Logistics & storage buildings across the canton of Geneva, 2024 (114 buildings).
Trend
−45.9 %
Change over 3 years (2021 → 2024: 899 → 486)
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredabove
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Logistics & storage
- Official use
- Dépôt
- Main energy carrier
- Gas
- Industrial zone
- ZIMOGA
IDC × SRE, climate-normalised: heating and hot water only, not process energy.