← Back to map

Logistics & storage · Vernier

Chemin de Delay 5

EGID 295009977 · Latest year: 2025 · ZIMOGA

398
IDC · MJ/m²·yr
331
3-year average
73
Estimated thermal energy · MWh
660
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
398
Peer median
398
Difference
+0.1 %
Percentile
50th
Zone median
278 (+43.2 %)

Higher IDC than 50 % of similar buildings. Close to the peer median.

Peer group: Logistics & storage buildings across the canton of Geneva, 2025 (104 buildings).

Trend

+7.9 %
Change over 3 years (2022 → 2025: 369 → 398)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

0100200300400500450201120122014201620182020202220242025
━ Building IDC╌ Peer median
Building type
Logistics & storage
Official use
Dépôt
Main energy carrier
Heating oil
Industrial zone
ZIMOGA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Chemin de Delay 5 — IDC heat benchmark · ThermoGeneva