Chemin Grenet 12
EGID 295030131 · Latest year: 2016 · ZIMOGA
Outdated data: the last IDC declaration for this building dates from 2016. It is shown for reference but excluded from statistics.
Compared with similar buildings
- IDC
- 252
- Peer median
- 423
- Difference
- −40.4 %
- Percentile
- 12th
- Zone median
- 376 (−32.9 %)
In 2016, higher IDC than 12 % of similar buildings. Lower than the peer median.
Peer group: Industrial buildings across the canton of Geneva, 2016 (433 buildings).
Trend
Geneva legal thresholds (indicative)
Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).
- 450 — measures requiredbelow
- 800 — significant (until 2026)below
- 650 — significant (from 2027)below
Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.
IDC history
- Building type
- Industrial
- Official use
- Atelier
- Main energy carrier
- Other
- Industrial zone
- ZIMOGA
IDC × SRE, climate-normalised: heating and hot water only, not process energy.