← Back to map

Logistics & storage · Meyrin

Rue Alphonse-LARGE 1

EGID 295074803 · Latest year: 2024 · ZIMEYSA

366
IDC · MJ/m²·yr
363
3-year average
122
Estimated thermal energy · MWh
1'203
Heated floor area (SRE) · m²

Compared with similar buildings

050100
IDC
366
Peer median
430
Difference
−14.9 %
Percentile
31st
Zone median
341 (+7.3 %)

Higher IDC than 31 % of similar buildings. Lower than the peer median.

Peer group: Logistics & storage buildings across the canton of Geneva, 2024 (114 buildings).

Trend

−1.3 %
Change over 3 years (2021 → 2024: 371 → 366)

Geneva legal thresholds (indicative)

Geneva's energy regulation compares the 3-year average IDC with thresholds. Above 450 MJ/m², owners must take improvement measures; above the "significant" threshold, energy renovation is mandatory (800 until 2026, 650 from 2027, 550 from 2031).

  • 450 — measures requiredbelow
  • 800 — significant (until 2026)below
  • 650 — significant (from 2027)below

Indicative reading based on published data. Only the cantonal energy office (OCEN) determines obligations.

IDC history

010020030040050045020112012201420162018202020222024
━ Building IDC╌ Peer median
Building type
Logistics & storage
Official use
Dépôt
Main energy carrier
Gas
Industrial zone
ZIMEYSA

IDC × SRE, climate-normalised: heating and hot water only, not process energy.

Rue Alphonse-LARGE 1 — IDC heat benchmark · ThermoGeneva